文档介绍:Dell Controlled Print
Peripheral Reliability Engineering
Reliability Qualification Plan of Remote Controls
Procedure
Number: REL 0145
Revision: X01
Authors:
Abdelkader Bouti
Subramanian Jayaram
DELL CONFIDENTIAL
THIS ITEM IS THE PROPERTY OF PUTER CORP., AUSTIN, TEXAS AND CONTAINS CONFIDENTIAL AND TRADE SECRET INFORMATION. THIS ITEM MAY NOT BE TRANSFERRED FROM THE CUSTODY OF PUTER CORP., AND THEN ONLY BY WAY OF LOAN FOR LIMITED PURPOSES. IT MUST NOT BE REPRODUCED IN WHOLE OR IN PARTS AND MUST BE RETURNED TO PUTER CORP. UPON REQUEST AND IN ALL EVENTS PLETION OF THE PURPOSE OF THE LOAN. NEITHER THIS ITEM NOR THE INFORMATION IT CONTAINS MAY BE USED BY OR DISCLOSED TO PERSONS NOT HAVING A NEED FOR SUCH USE OR DISCLOSURE CONSISTENT WITH THE PURPOSE OF THE LOAN WITHOUT THE PRIOR WRITTEN CONSENT OF PUTER CORPORATION.
Revision History
Date
Revision
Explanation of Changes
Change Originator
Approvals
03/01/04
X01
Initial piled.
A. Bouti
S. Jayaram
N/A
Table of Contents
1. PURPOSE 3
2. SCOPE 3
3. ACRONYMS 3
4. REFERENCE DOCUMENT(S) 3
5. REQUIREMENTS 3
. Unit under Test (UUT) Requirements 3
. Schedule 3
. Deliverables 3
6. QUALIFICATION PROCESS 3
. Task 1: Control Button/Switch Cycling Test 3
. Purpose 3
. Special Equipment/Personnel Requirements 3
. Test Criteria 3
. Failure Criteria 3
. Procedure 3
. Task 2: Battery Lid Opening/Closing Life Test 3
. Purpose 3
. Special Equipment/Personnel Requirements 3
. Test Criteria 3
. Failure Criteria 3
. Procedure 3
. Task 3: Torsion Resistance Test 3
. Purpose 3
. Special Equipment/Personnel Requirements 3
. Test Criteria 3
. Failure Criteria 3
. Procedure 3
. Task 4: Liquid Spill Test 3
. Purpose 3
. Special Equipment/Personnel Requirements 3
. Test Criteria 3
. Failure Criteria 3
. Procedure 3
. Task 5: Drop Test 3
. Purpose 3
. Special Eq